Sign In | Join Free | My burrillandco.com
Home > Pelton Turbine Generator >

High Head Double / Multi Nozzle Pelton Turbine Generator 500-1000rpm/ Min Speed

    Buy cheap High Head Double / Multi Nozzle Pelton Turbine Generator 500-1000rpm/ Min Speed from wholesalers
     
    Buy cheap High Head Double / Multi Nozzle Pelton Turbine Generator 500-1000rpm/ Min Speed from wholesalers
    • Buy cheap High Head Double / Multi Nozzle Pelton Turbine Generator 500-1000rpm/ Min Speed from wholesalers
    • Buy cheap High Head Double / Multi Nozzle Pelton Turbine Generator 500-1000rpm/ Min Speed from wholesalers

    High Head Double / Multi Nozzle Pelton Turbine Generator 500-1000rpm/ Min Speed

    Ask Lasest Price
    Brand Name : Forster
    Model Number : CJA237/475-W-115
    Certification : CE/TUV/ISO9001/From-E
    Price : Negotiable
    Payment Terms : L/C, T/T
    Supply Ability : 50 Set/Sets per Month
    Delivery Time : 120days
    • Product Details
    • Company Profile

    High Head Double / Multi Nozzle Pelton Turbine Generator 500-1000rpm/ Min Speed

    High Efficiency High Head Double Nozzle And Multi-Nozzle Hydro Pelton Turbine Generator For HPP


    Our main products included:


    1. Kaplan turbine generators series.


    2. Turgo turbine generators series.


    3. Tubular turbine generators series.


    4. Francis turbine generators series.


    5. Pelton turbine generators series.


    Product features:


    The impact turbine can be divided into two types according to the flow direction of the water flow (also known as the water bucket type) and the oblique type. The structure of the slanting turbine is basically the same as that of the puddle turbine, except that the direction of the jet has an inclination angle and is used only for small units.


    Theoretical analysis proves that the efficiency is highest when the circumferential velocity at the pitch circle is about half of the jet velocity. When the load changes, the direction of the water inlet speed of the runner is constant. In addition, the turbines are used in the high-head power station. The head change is relatively small and the speed changes little, so the efficiency is less affected by the load change. The efficiency curve is relatively flat and the highest efficiency is over 91%.


    A hydraulic turbine is a power machine that converts the energy of a water stream into a rotating mechanical energy. It is a turbomachinery in fluid machinery. As early as around 100 BC, China emerged as the prototype of the turbine, the water wheel, used to pump and drive food processing equipment. Most modern hydro turbines are installed in hydropower stations to drive generators to generate electricity. In the hydropower station, the water in the upstream reservoir is led to the turbine through the water conduit, pushing the turbine runner to rotate and driving the generator to generate electricity. The finished water is drained downstream through the tailpipe. The higher the head and the greater the flow, the greater the output power of the turbine.


    1. suitable for high head,small flow and flow changes in large runoff hydropower station.


    2. With the power plant investment is small,compact units structure characteristics.


    3. Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.


    4. Suitable for high head,small flow station in mountainous area.


    5. A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.


    Product parameters:
    Pelton tubine generator unitGeneratorGevernor or Regulating workValve
    Turbine
    TypeWater head(m)Discharge (m³/s)Output(kw)Speed (r/min)TypeCapacity (kw)
    CJA475-W-125/2x141371.5411739375SFW1600-16/26001600CJWT- II BWT-6000DN800
    1571.6622151SFW2000-16/26002000
    1831.7832688428.6SFW2500-14/26002500
    2141.9413422SFW3200-14/26003200
    2482.0824255500SFW4000-12/26004000CJWT- II BWT-10000
    2872.2375291SFW5000-12/26005000
    CJA475-W-140/2x141161.4291366300SFW1250-20/26001250CJWT- II BWT-6000DN800
    1371.5411739333.3SFW1600-18/2600 SFW2000-18/26001600
    1571.66221512000
    1831.7832688375SFW2500-16/26002500
    2141.9413422428.6SFW3200-14/26003200
    2482.0824255SFW4000-14/26004000CJWT- II BWT-10000
    2872.2375291500SFW5000-12/26005000
    3332.4176632SFW6300-12/26006300
    4002.4958421600SFW8000-10/26008000
    CJA475-W-140 /2x161141.8511739300SFW1600-20/26001600CJWT- II BWT-6000
    1321.9772151SFW2000-20/26002000
    1532.1322688333.3SFW2500-18/26002500
    1792.323422375SFW3200-16/26003200CJWT- II BWT-10000DN 1000
    2072.4954255SFW4000-16/26004000
    2402.6755291428.6SFW5000-14/26005000
    2792.8846632500SFW6300-12/26006300

    Product pictures:


    High Head Double / Multi Nozzle Pelton Turbine Generator 500-1000rpm/ Min SpeedHigh Head Double / Multi Nozzle Pelton Turbine Generator 500-1000rpm/ Min Speed


    Installation picture:


    High Head Double / Multi Nozzle Pelton Turbine Generator 500-1000rpm/ Min Speed


    Company Information

    Our workshop

    Advantages

    Packaging & Shipping

    FAQ

    Q1, Which turbine should I choose?

    Please tell me the water head, flow rate, frequency, Total power you need

    , voltage, on grid or off grid operation, we will propose a solution.


    Q2, Can your factory provide all the equipment for hydropower generation?

    Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.


    Q3, Can you do EPC for a hydroelectric power plant?

    Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.


    Q4,Is your company a trading company or a manufacturer?

    We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.


    Q5, How many an acceptable MOQ?

    For this product, our acceptable MOQ is 1 set.


    Q6,How long is the delivery time?

    Delivery times range from 15 days to 6 months depending on the model you are purchasing.


    Q7,Does your company have its own independent official website?

    Of course, and we can see more information about our company and products on our official website.

    website address: www.fstgenerator.com

    Quality High Head Double / Multi Nozzle Pelton Turbine Generator 500-1000rpm/ Min Speed for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Chengdu Forster Technology Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)