Sign In | Join Free | My burrillandco.com
Home > Turgo Turbine Generator >

500kw Turgo Turbine Generator Used In Hydroelectric Power Plant Simple Operation

    Buy cheap 500kw Turgo Turbine Generator Used In Hydroelectric Power Plant Simple Operation from wholesalers
     
    Buy cheap 500kw Turgo Turbine Generator Used In Hydroelectric Power Plant Simple Operation from wholesalers
    • Buy cheap 500kw Turgo Turbine Generator Used In Hydroelectric Power Plant Simple Operation from wholesalers
    • Buy cheap 500kw Turgo Turbine Generator Used In Hydroelectric Power Plant Simple Operation from wholesalers

    500kw Turgo Turbine Generator Used In Hydroelectric Power Plant Simple Operation

    Ask Lasest Price
    Brand Name : forster
    Model Number : XJA-W-63/1*10
    Supply Ability : 50 Unit/Units per Month
    Price : Negotiable
    Certification : CE/TUV/ISO9001/From-E
    Delivery Time : 120days
    • Product Details
    • Company Profile

    500kw Turgo Turbine Generator Used In Hydroelectric Power Plant Simple Operation

    High head low price simple operation 500kw hydro Turgo turbine generator for hydro power Plant


    Our main products included:


    1. Kaplan turbine generators series.


    2. Turgo turbine generators series.


    3. Tubular turbine generators series.


    4. Francis turbine generators series.


    5. Pelton turbine generators series.


    Product features:


    The impact type Turgo turbine is composed of a manual speed regulating valve (some are needles), a nozzle, a runner, a casing, a bearing and a shaft seal.
    The nozzle direction of the turbulent turbine is at an angle (typically 22.5°) to the plane of rotation of the runner, and the jet impinges on the impeller obliquely.

    The nozzle is mounted behind the pressure water pipe manual speed control valve. The nozzle is a conical tube. As the cross-sectional area of ​​the conical tube becomes smaller, the water flow gradually accelerates, forming a high-speed jet at the nozzle outlet, impacting the rotor.
    In order to adjust the flow rate and control the output of the unit, the unit operates well and has high efficiency. Some micro-units are regulated with gate valves.

    The runner is the heart of the turbine. The larger-capacity slanting runner has complex blades and a streamlined section (such as the airfoil of the aircraft). The manufacturing process requires high requirements. For the miniature slanting wheel, in order to simplify the production process and reduce the cost, a hemispherical blade is formed. The blades of the runner are stamped out on a punch with a steel plate with a thickness of 2 mm and trimmed by trimming. An impeller generally consists of 18 to 22 blades. The blade is assembled and welded to form a runner, and the whole manufacturing process is simple.


    1. Horizontal unit has the advantages of simple structure,convenient repair,reduce the plant height,advantages in reducing excavation depth.


    2. The vertical unit with plant plane size small,a runner can be provided with a plurality of nozzles,(at most can be installed six nozzles),high specific speed,the same size as units of capacity is relatively small,light weight and so on.


    Product features:

    XJA-W Turgo tubine generator unitGeneratorUnit output (kw)Gevernor or Regulating workValve (mm)
    Turbine
    TypeWater head(m)Discharge (m³/s)Output(kw)Speed (r/min)TypeCapacity
    XJA-W-70/1*16.51251.013982.6750SFW1000-8/11801000914CJWT- 1 BWT-6000DN600 P=25kg/cm2
    1301.0341053.6SFW1000-8/11801000980
    1401.731199.6SFW1250-8/118012501116
    1501.111344.3SFW1250-8/118012501250
    1601.1471492.5SFW1600-8/143016001388
    1701.1821642SFW1600-8/143016001527
    1801.2161786.5SFW1600-8/143016001661
    1901.250.1931.5SFW2000-8/143020001796
    2001.2822077.6SFW2000-8/143020001932
    2101.3142225.1SFW2000-8/143020002069
    XJA-W-80/1x181001.09883.2500SFW800-12/1730800795CJWT- 1 BWT-6000600
    1101.1411015.8SFW1000-12/17301000914
    1201.191151.5SF1000-12/173010001036
    1301.241299.9600SFW1250-10/143012501169
    1401.2871460SFW1250-10/143012501314
    1501.3331620.2SFW1600-10/143016001458
    1601.3761779.7SFW1600-10/143016001602
    1701.4191947.6SFW1600-10/143016001752
    1801.462106.3SFW2000-10/143020001895
    1901.52278.6SFW2000-8/143020002119
    2001.542474.6750SFW2500-8/173025002301
    2101.582682.1SFW2500-8/173025002494
    XJA-W-80/1x201001.3381093.4500SFW1000-12/17301000962CJWT- I BWT-6000600
    1101.41253.9SFW1250-12/173012501103
    1201.4651421.1600SFW1250-12/173012501250
    1301.5251610.3SFW1600-10/143016001449
    1401.5381757.4SFW1600-10/143016001582
    1501.6382003SFW2000-10/173020001802
    1601.6922199SFW2000-10/173020001979
    1701.7442399.5SFW2000-10/173020002159
    1801.7952602.3SFW2500-10/173025002342
    1901.842819.1750SFW2500-8/173025002622

    Product pictuers:


    500kw Turgo Turbine Generator Used In Hydroelectric Power Plant Simple Operation500kw Turgo Turbine Generator Used In Hydroelectric Power Plant Simple Operation

    500kw Turgo Turbine Generator Used In Hydroelectric Power Plant Simple Operation



    Company Information:

    Our workshop

    Advantages

    Packaging & Shipping

    FAQ

    Q1, Which turbine should I choose?

    Please tell me the water head, flow rate, frequency, Total power you need

    , voltage, on grid or off grid operation, we will propose a solution.


    Q2, Can your factory provide all the equipment for hydropower generation?

    Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.


    Q3, Can you do EPC for a hydroelectric power plant?

    Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.


    Q4,Is your company a trading company or a manufacturer?

    We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.


    Q5, What is an acceptable MOQ?

    For this product, our acceptable MOQ is 1 set.


    Q6,How long is the delivery time?

    Delivery times range from 15 days to 6 months depending on the model you are purchasing.


    Q7,Does your company have its own independent official website?

    Of course, and we can see more information about our company and products on our official website.

    website address: www.fstgenerator.com



    Quality 500kw Turgo Turbine Generator Used In Hydroelectric Power Plant Simple Operation for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Chengdu Forster Technology Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)